The power problems we solve for heavy industry
Demand spikes
A single arc furnace melt cycle sets the demand charge for the entire billing period, even if the rest of the month runs flat.
Voltage sags
A grid-side voltage sag during an active heat drops furnace controls offline and forces a manual restart before the next pour.
Grid outages
A 3-second grid outage at a remote processing plant or compression station wipes equipment states and idles crews through a full manual restart sequence.
Reactive power penalties
Arc furnaces, crushers, and large conveyor motors pull heavy reactive loads that generate power factor penalties on every billing cycle.

One demand spike no longer sets your bill for the month
Torus learns your facility's load profile and sets a demand ceiling. When a furnace heats, a crusher startup, or a compressor cycle pushes toward that limit, stored energy discharges in milliseconds to offset the spike. The result: lower demand charges every billing cycle, without changing how your operation runs.

Reactive power penalties gone from every bill
Arc furnaces, large conveyor motors, and crusher equipment generate heavy reactive loads that push power factor below utility thresholds. Torus continuously supplies reactive power to keep your facility's power factor within range — eliminating the penalties that show up on every bill.
Ready to improve your power?
Utility Partnership
We partner with the utility to improve your on-site power and support the grid
Capital cost
No capital cost to you
Available to Rocky Mountain Power, Pacific Power, and Portland General Electric customers
One vendor, one contract
24/7 monitoring
Expert maintenance
Energy as a Service
One all-in subscription for our full-stack system
No capital expense option
One vendor, one contract
24/7 monitoring
Expert maintenance