Torus Reserve

Flexible capacity at the grid edge

Hybrid energy storage that eases congestion, serves peak demand, and stabilizes frequency and voltage at the point of load.

Flywheel + BESS configuration

Real-time load shaping

24/7 monitoring & response

Meet Torus Reserve

Reserve pairs flywheel and chemical batteries. Spin delivers high-power output in milliseconds and Pulse supplies longer-duration capacity, so one system manages every type of load.

Torus energy storage system with rooftop solar panels at a remote desert site at dusk
01

10C

Discharge rating on Torus Spin — 20x higher than traditional BESS.

02

25,000

Cycle lifespan on Torus Spin. Extends the life of Pulse’s chemistry.

03

12-16 weeks

From contract to commissioning, bringing flexible capacity online faster.

04

99.9% uptime

Every layer of Torus Reserve works together to keep assets online when called on.

See how Reserve works in your industry

Built for the challenges grid operators and industrial facilities face today.

Close view of Torus units with callouts for 99.9% fleet uptime, 250 ms discharge, and SCADA

Add flexible load and increase resilience

  1. Hold frequency and voltage as thermal generation retires
  2. Expand capacity in months, not years
  3. Relieve feeder congestion without building new lines

See how
Two technicians installing a panel on a Torus Reserve outside a building

Support from system design to installation

We handle every step of the sizing, permitting, and installation process, helping to get your project approved and in the ground as quickly as possible. 

1 - System Design

Our experts analyze your power needs and operational requirements, carefully designing a system to your exact specifications. 

2 - Permitting

We submit permits and work with your local permitting office to expedite the approval process. 

3 - Installation

Torus Reserve is designed for minimal on-site assembly and electrical work, allowing our expert install crews to quickly commission your system. 

4 - Lifetime Support

Our work doesn't end when your system is installed. We monitor your assets around the clock in real time to maximize safety, longevity, security, and performance. 

Labeled diagram of Reserve hybrid energy storage with Pulse storage units and Spin flywheels

Specs and stats

1 - System Size

Modular and scalable up to 100+ MW

2 - Lifespan

25 years

3 - System Lifecycles

25,000 Spin | 7,500 Pulse

4 - Uptime

Designed for 99.9%

5 - Monitoring

24/7 real-time

6 - Response Time

Milliseconds

7 - Key Certifications

UL 9540, UL 9540A, UL 1741 SB, UL 1973, UN 38.3, IEEE 1547, UL 1741 SA, IEEE 2030.5

Technician in safety glasses and gloves assembling a metal enclosure in a manufacturing facility
American-made energy infrastructure
Built in our 545,000 sq ft Salt Lake City facility, BABA-compliant, backed by a North American supply chain.
Torus Reserve system at commercial building
Power your project with Torus
Start with free design and planning, customized to your grid or facility requirements.

Your questions, answered.